news-vibrant domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/fevluug2ormp3a1f/public_html/wpt.hvhappens.com/wp-includes/functions.php on line 626007-07-2024

Livingston, Texas – The Trinity River Authority is advising initial repairs to the Lake Livingston Dam Spillway will be completed Monday afternoon prior to the arrival of major flooding from Beryl.
Crews have been working around the clock to repair the dam’s spillway which was damaged from recent flooding. On June 28th the river authority released a declaration of a “potential failure watch.” A Dam Damage Assessment was implemented to address the issues in accordance with Federal guidelines regulated by the Federal Energy Regulatory Commission (FERC).
The River Authority stated “the dam will be able to pass high-flow events without impacting the integrity of the dam.”
In 2017 a spillway failure at the Oroville Dam in California resulted in the evacuation of over 180,000 people downstream.


The River Authority stated, “Although there is no immediate danger of either failure or breach of the dam, the potential does exist however remote it might be. The day-to-day operation of the dam will continue as necessary, although normal gate operations may vary as conditions dictate. This declaration is in conformance with the Emergency Action Plan as approved by the TRA. TRA will continue to monitor the spillway’s status and will issue updates as appropriate.”
]]>